Tuesday, September 14, 2004

14 DAYS...

I have even more to add to the list.... Any item with ** next to it are being completed tonight. The items with # next to them are items that are almost complete. I'm so tired I want to cry.

**Haul final load to Marks
**Haul fridge and chairs to buyers home
Haul shelves and lawn mower to Pats

# Paint north side of house
# Remove construction materials from site
Complete electrical clean up including circuits in garage and house
Place cover plates over all outlets
# Install GFI protection in basement bathroom

# Install drain cover on floor in basement bathroom
Install base boards upstairs

Sand Basement Walls
Prime Basement Walls
Paint Basement Walls
Hang basement ceiling
Hang sheetrock upstairs
Install all vents
Paint vents
build step on porch
Install porch railing
Install basement light
change all burnt out light bulbs
Install door bell in front
Install side door bell

Buy packing tape
Tape and mud upstairs
2nd coat mud upstairs
3rd coat mud upstairs
Sand upstairs
Prime upstairs

Paint upstairs
Install carpet upstairs

Build Closet upstairs
Install peg board downstairs
Install basement step railing
Cut carpet into 3 ft lengths and 1 ft diameter rolls
Empty Storage unit upstairs
# Burn extra wood
Dump fluorescent light bulbs
# Paint den door
Paint upstairs door
Install basement door
Install upstairs door
Fix electrical units upstairs
Throw out crap I kept thinking I might use or fix
Go through den closet
Go through living room closet

Hang smoke alarm upstairs

Hang smoke alarm in den
Hang smoke alarm in bedroom
Hang smoke alarm in basement

Move Marks car
Make signs for LaJeanne
Make signs for Kurt
Make signs for sale
Install a make up (combustion air) air duct near basement furnace
Set up garage sale
Have Main Garage sale

Have sale each day after work
Pack all Garage sale items up for good will
Pack kitchen items
Pack bedroom items
Pack Den items
Pack bathroom items
Pack laundry items
Pack garden items
Pack shop items
Cancel all utilities
Fill out address change request on bills
Install trim around side door

Paint trim around side door
Paint Bathroom wainscoting
Glue Bathroom wall paper
Paint garage door
Pull all weeds in driveway cracks
Pull all weeds in sidewalk cracks
Finish backyard walkway
Sand upstairs railing
Varnish upstairs railing
Find social security card

**Gather all items for closing
**FedEx items for closing to finace dude

Hire carpet installers
Check on Pod info
# Hire moving pod
Make veil for Christies wedding





UGH!!!



So I called and left a message with my realtor hoping they would call me back with the news of the appraisal. No luck.

Here I sit worried half to death that it didn't go through.

CALLMEDAMNIT!


8:59 AM

No comments:

Where I've Been