Thursday, September 16, 2004

12 DAYS.... lord help me.....

I can say that yesterday when I commented that it was a LUCKY 13 day - it truly was. As of yesterday it's official. The FHA appraiser appraised the house for the amount needed so the deal goes through. At this point the only thing that could stop this now is the buyer simply deciding that she doesn't want to go through with it.

I'm moving full speed ahead. This weekend is mostly shot with the wedding I'm in but it should be a nice break from the hell I have been in the last month or so. I don't want to get excited just yet but soon, I may have the coolest place to live ever.

Haul final load to Marks
Haul fridge and chairs to buyers home
Haul shelves and lawn mower to Pats
# Paint north side of house
# Remove construction materials from site
Complete electrical clean up including circuits in garage and house
Place cover plates over all outlets

Install rod in upstairs closet
**Shop for the wedding outfit
Visit Grants Happy Hour (THURSDAY)
Grooms dinner (FRIDAY)
Wedding (SATURDAY)
Reception (SATURDAY)
Doctor (MONDAY)
Haul items to parents
# Install GFI protection in basement bathroom

# Install drain cover on floor in basement bathroom
Install base boards upstairs

Sand Basement Walls
Prime Basement Walls
Paint Basement Walls
Hang basement ceiling
Hang sheetrock upstairs
Install all vents
Paint vents
build step on porch
Install porch railing
Install basement light
change all burnt out light bulbs
Install door bell in front
Install side door bell

Buy packing tape
Tape and mud upstairs
2nd coat mud upstairs
3rd coat mud upstairs
Sand upstairs
Prime upstairs

Paint upstairs (FRIDAY)
Paint downstairs door (SUNDAY)
** Trim upstairs (THURSDAY)
Install carpet
upstairs (TUESDAY 21st)
Build Closet upstairs
Install peg board downstairs
Install basement step railing
Cut carpet into 3 ft lengths and 1 ft diameter rolls
Empty Storage unit upstairs
# Burn extra wood
Dump fluorescent light bulbs
# Paint den door (SUNDAY)
Paint upstairs door (SUNDAY)
Install basement door
Install upstairs door
Fix electrical units upstairs
Throw out crap I kept thinking I might use or fix
Go through den closet
Go through living room closet

Hang smoke alarm upstairs

Hang smoke alarm in den
Hang smoke alarm in bedroom
Hang smoke alarm in basement

Move Marks car
Make signs for sale
Install a make up (combustion air) air duct near basement furnace
Set up garage sale
Have Main Garage sale

Have sale each day after work
** Pack all Garage sale items up for good will (put out front of house)
# Pack kitchen items
Pack bedroom items
Pack Den items
Pack bathroom items
Pack laundry items
Pack garden items
Pack shop items
Cancel all utilities
Fill out address change request on bills
Change address with Post office
Install trim around side door

Paint trim around side door (SUNDAY)
Paint Bathroom wainscoting
Glue Bathroom wall paper
Paint garage door
Pull all weeds in driveway cracks
Pull all weeds in sidewalk cracks
Finish backyard walkway
Sand upstairs railing
Varnish upstairs railing
Find social security card

Gather all items for closing
FedEx items for closing to fiance dude

Hire carpet installers
Check on Pod info
Hire moving pod
Pay for Carpet
Schedule Carpet installation
Hang Upstairs stairs railing
Have Pod delivered (FRIDAY 17th)
FINAL FHA INSPECTION (FRIDAY 24th)
FINAL CITY INSPECTION (FRIDAY 24th)
Make veil for Christies wedding

No comments: